1 / 5
| System | Model | Description | Qty | Unit |
|---|---|---|---|---|
| 20KW Solar System | XD-20KW | PV solar panel 550W (2279*1134*35mm) | 36 | pcs |
| 20KW Solar System | XD-20KW | 20KW Three phase Solar Grid Tied Inverter (IP65) | 1 | set |
| 20KW Solar System | XD-20KW | DC Cables 4mm (Red+Black), TUV certificates | 200 | meters |
| 20KW Solar System | XD-20KW | Tile roof: Aluminium Type | 1 | set |
| 20KW Solar System | XD-20KW | MC4 Connector IP67 | 1 | pairs |
An off-grid solar energy system is not connected to the utility grid, whereas an on-grid (aka grid-tied) solar energy system is connected to the utility grid. Whether off-grid or on-grid system will determine your access to electricity, what equipment is needed for excess production, what happens when the grid goes down, and how you're billed for electricity.
| Specification | Load |
|---|---|
| 1KW | 50W Fan- 11 Hours, 200W Computer- 2.5 Hours, 60W TV- 9 Hours |
| 2KW | 50W Fan- 20 Hours, 200W Computer- 4.5 Hours, 60W TV- 16.5 Hours |
| 3KW | 50W Fan- 30 Hours, 200W Computer- 7.5 Hours, 60W TV- 27 Hours |
| 4KW | 50W Fan- 63 Hours, 200W Computer- 12 Hours, 2KW Air Con- 1 Hour |
| 5KW | 50W Fan- 92 Hours, 200W Computer- 16 Hours, 2KW Air Con- 1.5 Hour |